Superhot rock geothermal means producing heat from rock hotter than about 375 °C at pressures above 22 MPa. Water there is supercritical, and the US Department of Energy says it can deliver several times the power density of cooler rock. Two research wells in Iceland have met fluid hotter than 400 °C, and both were damaged.

Every figure below is quoted from the source listed beside it. Targets are labelled as targets.

01 / In brief

The short answer.

  • The threshold is the critical point of water, about 374 °C and 22.1 MPa. ARPA-E and the US Department of Energy both define superhot as above 375 °C.
  • ARPA-E expects a superhot well to produce up to 30 to 50 megawatts of electricity, against about 10 for an enhanced geothermal well today.
  • Iceland's IDDP-1 well flowed steam at 450 °C and suffered acid corrosion and silica erosion. IDDP-2 logged 426 °C at about 4,550 m and its casing was damaged.
  • Wells fail through their steel, cement and instruments. Casing breaks when the well is heated and cooled, and electronics stop working near 225 °C.

02 / Motive

Why go hotter.

Each well is expensive, so power per well drives the price of electricity. ARPA-E says current equipment holds enhanced geothermal to about 220 °C and about 10 megawatts of electricity per production well, and that superhot reservoirs could raise this to 30 to 50. Its SUPERHOT program aims at 10 to 20 GW of baseload power at under $30 per megawatt-hour by 2040.

Other estimates of output per well exist. A 2022 study by LucidCatalyst and HERO for the Clean Air Task Force modelled 17 to 29 MW per production well at 55 kg/s. Iceland's power company Orkuveitan is targeting 20 to 50 MW from one well in the IDDP-3 project, and says it has not demonstrated that figure. Conventional wells there make 2 to 7 MW.

03 / Record

Wells drilled so far.

WellWhat was measuredWhat went wrong
IDDP-1, Krafla, Icelandsuperheated steam at 450 °C and 140 bar at the wellheadcondensed steam carried hydrochloric and hydrofluoric acid; silica eroded surface equipment when wellhead pressure fell below 80 bar; repeated shutdowns increased corrosion
IDDP-2, Reykjanes, Iceland426 °C at 340 bar logged at about 4,550 m; about 600 °C inferred at the bottomproduction casing damaged between 2,307 and 2,380 m, presumably by cyclic heating and cooling
Newberry, Oregon (Mazama Energy)331 °C in October 2025; a later well above 700 °Fnone reported

At IDDP-2 the logging tools stayed below 65 °C in rock hotter than 400 to 500 °C for as long as cold water circulated. The production casing was damaged all the same, presumably by repeated heating and cooling.

Next in line: IDDP-3 in Iceland is planned in four stages from late 2026 to 2028. Quaise Energy's Project Obsidian in Oregon targets a well above 400 °C and first power in 2030. Quaise drills with millimetre waves and had completed a 118 m hole in granite by July 2025.

04 / Limits

What fails first.

ComponentPublished limitSource
Casing and couplingsmost well failures in a review of 20 high-temperature wells came from thermal stress during quenching or the start of productionKruszewski and Wittig, 2018
Portland cement with 35% to 40% silica flourproven where produced fluid stays below 350 °CKruszewski and Wittig, 2018
Downhole electronics in serviceabout 210 to 225 °CHephae, 2026; IMAPS HiTEC, 2016
Temperature logging tools350 °C for four hoursKruszewski and Wittig, 2018
Polyimide-coated optical fibre300 °C continuously, 350 °C brieflymanufacturer's statement (Exail)
Silicon carbide circuits, in the laboratoryone year at 500 °C in airNASA Glenn, 2018
Casing connection test standard ISO/TS 12835:2022written for wells that cycle from well below 180 °C up to maxima of 180 °C to 350 °C or above; covers connections onlyISO

ARPA-E's program description says conventional steel casing and Portland cement are inadequate for superhot wells, and that well materials have to survive high temperature, rapid temperature change and corrosive fluid for 15 years or more.

05 / Funding

Who is funding it.

  • ARPA-E SUPERHOT announced eight awards on 12 November 2026: Blade Energy Partners ($6.3m), Lawrence Livermore ($5.5m), Los Alamos ($3.5m), University of Oklahoma ($3.1m), Oak Ridge ($3.0m), University of Southern California ($3.0m), XGS Energy ($3.0m) and Pacific Northwest National Laboratory ($2.6m).
  • The US Department of Energy is funding a superhot EGS demonstration above 375 °C on the western flank of Newberry Volcano in Oregon.
  • Japan's NEDO plans five 100 MW class supercritical geothermal plants around 2040 to 2050 and estimates the resource at 11 GW.
  • The European SHiFT consortium received €10m from Horizon Europe for technology above 400 °C.
  • Mazama Energy raised $135m in September 2026. Quaise Energy closed a Series B of $180m in August 2026.

06 / Zemanium

What we are working on.

Our work is on the well itself: how casing and cement behave through heating and cooling cycles above 375 °C, and how to record a test so that someone outside the company can check it. We use gauges that can be bought today. In November 2026 we stopped our own long-line acoustic sensor after it failed a simulation gate we had set in advance; the record is on the research page.

If you operate, design or finance hot wells and want to compare notes, write to toni@zemanium.com.

07 / Questions

Common questions.

What is superhot rock geothermal?

It is geothermal energy from rock hotter than about 375 °C at pressure above 22 MPa, where water becomes supercritical. A well in those conditions can carry several times the energy of a conventional geothermal well.

How hot is superhot rock?

Above 375 °C by the definitions of ARPA-E and the US Department of Energy. Iceland's IDDP-1 produced steam at 450 °C, and IDDP-2 logged 426 °C with about 600 °C inferred at the bottom of the well.

Has anyone produced power from superhot rock?

No commercial plant runs on superhot rock yet. IDDP-1 flowed steam at 450 °C and IDDP-2 logged 426 °C at 340 bar, and both wells were damaged. Quaise Energy targets first power in Oregon in 2030, and Japan's NEDO plans plants around 2040 to 2050.

What is the IDDP?

The Iceland Deep Drilling Project, a research programme run by Icelandic energy companies to drill into supercritical geothermal zones. IDDP-1 was drilled at Krafla, IDDP-2 at Reykjanes, and IDDP-3 is planned from late 2026.

Why do superhot wells fail?

Mostly from thermal cycling. Steel casing expands when the well heats and contracts when cold water is pumped in, and the stress breaks casing and couplings. A 2018 review of 20 high-temperature wells found that most failures came from thermal stress during quenching or the start of production.

How much power can one superhot well produce?

ARPA-E expects up to 30 to 50 megawatts of electricity per well, compared with about 10 megawatts for an enhanced geothermal well at 220 °C. That output has not been demonstrated.

08 / Sources

Sources.

  1. ARPA-E, SUPERHOT program, read 20 November 2026; project descriptions, November 2026.
  2. US Department of Energy, Enhanced geothermal systems and EGS pilot demonstrations.
  3. Friðleifsson and others, IDDP-2 at Reykjanes, Proceedings World Geothermal Congress 2020+1, paper 31002.
  4. Ilic and others, IDDP-1 fluid handling, Proceedings World Geothermal Congress 2020+1.
  5. Kruszewski and Wittig, "Review of failure modes in supercritical geothermal drilling projects", Geothermal Energy 6:28, 2018.
  6. LucidCatalyst and HERO for the Clean Air Task Force, superhot rock techno-economic study, November 2022.
  7. ThinkGeoEnergy, report of an Orkuveitan interview on IDDP-3, 10 September 2026.
  8. TechCrunch, Mazama Energy, 16 November 2026.
  9. Quaise Energy, Looking back on 2025 and Project Obsidian release, 22 September 2026. Company statements.
  10. NEDO, supercritical geothermal project P21001, updated 9 July 2024.
  11. NASA Glenn Research Center, silicon carbide integrated circuits at 500 °C, HiTEC 2018.
  12. Hephae Energy Technology, news, September 2026; Exail, harsh environment fibres.
  13. ISO/TS 12835:2022, Qualification of casing connections for thermal wells.