Define the requirement
Which measurement changes a decision at your well? Set the temperature, pressure, duration and accuracy requirement, along with installation constraints and the current alternative.
A geothermal invention lab
Our mission is to make geothermal the world's dominant energy source. We develop the instruments and mechanical systems to draw more heat from each well, keep it producing longer and cut the cost of electricity.
$30 to $45/MWh. Our target for firm geothermal power.
Registered 19 November 2026
Project Red in Nevada is the first enhanced geothermal well pair with a public production history, reported monthly to the Nevada Division of Minerals. Our conduction model fits its nine steady months to 0.51 °F, and the record shows 65.9% of injected mass coming back to the producer (model results on the regulator's measured data).
Six temperature forecasts and one water forecast were hashed and time-stamped by two independent authorities before the months they describe. Each one is scored when the regulator publishes that month. One command, python3 reproduce.py, rebuilds every number from the public workbook.
Browse the thermal-bench layout, release demonstrator and seal cassette. Each drawing links to its development record and test requirements.

Engineering drawings for thermal stores, flow routing and the measurement chain.
Engineering-review geometryA room-temperature demonstrator with a dimensioned build set and 56 mm of gate travel.
Room demonstrator fabrication releaseSeal development with a cycled-test protocol, cartridge interfaces and a pressure-reaction design campaign.
Pressure engineering in progressImages show engineering geometry. Each hot-service design is released after a physical test campaign at its matched duty.
Held and released states, specimen kits, flow fixtures and dimensioned build sheets.
Browse all public hardwareSourced guides to geothermal cost, enhanced geothermal systems and superhot rock, and one page listing every model, record and drawing we have published with its licence.
Change the economic assumptions, explore an illustrative reservoir, or inspect the published Utah FORGE field profile.
Peak-sized plant capital, wells, financing and lifetime net output in one model. Includes 2,000 shared uncertainty draws.
Run the current model RESERVOIR EXPLORERChange flow, spacing and rock temperature to see thermal evolution and pumping in the illustrative 3D model.
Explore in 3D Historical design assumptions · current economics in the decision room FIELD REPLAYInspect 518 published SLB / Utah FORGE interpretation rows, with attribution and gaps in coverage.
Inspect the field data External processed field interpretation · CC BY 4.0Our model sets one budget for the plant and wells against their lifetime electricity output. The scenarios below set the costs the hardware program is designed to reach.
Target capital package
8% discount rate
The same capital package
4% discount rate
Assumed $1,500/gross-kW plant, $15m subsurface and $3m other capital. Initial rock temperature 200 °C; 25 simulated years. Peak-sized plant: 28.322 MW gross.
Both packages are design requirements. On the reference assumptions the same plant computes $83.02/MWh at 8%.
Inspect every inputSponsored research
We are seeking operators and equipment manufacturers with a measurement problem that existing tools do not solve well enough.
A first project defines the operating conditions, compares available instruments and plans the experiment that decides whether a new design is worth building.
Which measurement changes a decision at your well? Set the temperature, pressure, duration and accuracy requirement, along with installation constraints and the current alternative.
Agree a bounded development scope, responsible engineer and laboratory plan. You receive a reviewed comparison with the raw results.
If the result meets the requirement, agree the next prototype or OEM integration study. Equipment supply and field trials need their own engineering and commercial terms.
We can also scope a sensor test-plan review. Tell us what you need to decide and what evidence you already have.
Work starts once scope, staffing, funding and data and IP terms are agreed.
We are recruiting engineers to lead physical development and seeking research sponsors and investors for our work on wells above 375 °C. Our long-term plan extends from equipment to Zemanium power plants.
For enquiries, email toni@zemanium.com.