ZEMANIUM / DECISION ROOM05 OCT 2026 · SIMULATED / PUBLISHED DATA · NO PLANT CONTROL

Geothermal power-cost model.

Compare 1,080 cost scenarios using the retained lifetime-output models. Change installed plant cost, subsurface cost and financing to calculate what a target electricity price requires. The scenarios are assumptions, not supplier quotes.

SIMULATED / assumption scenarios · peak-sized plant · 25-year horizon

Shared capital budget.

CONDITIONAL LCOEUSD / exported MWh · costs are assumptions
PEAK SOURCE GROSS OUTPUTMW · source-model basis, not a vendor guarantee
INSTALLED CAPITALUSD · before annual costs and explicit life-cycle events

Design to the joint ceiling.

The block ceiling reserves the selected subsurface and other costs. These allowances are alternatives, not additive savings. Signed negative ceilings remain visible: even a free block cannot close that case.

Inputs for the next review.

  1. Operator: constrain sustainable flow, pressure, temperature decline, chemistry and contact volume.
  2. Plant supplier: quote one fixed machine and its off-design map, including auxiliaries, cooling and reinjection constraints.
  3. Completion lead: cost the actual bore and lifetime workovers. Reconcile every excluded scope before spending the budget.

Calculation boundary and primary sources

No new physics was generated by this cost sweep. The retained GEOPHIRES-X 3.18.3 trajectories assume a reservoir geometry and 90% utilization; no firm-capacity guarantee follows. Export deducts pumping and 5% of gross auxiliaries. Annual costs: 2% of installed capital, source make-up water and $8/exported MWh. Explicit events: $5m in year 12 and $2m in year 25. All capital is at time zero; construction interest is not modeled. Installed block, subsurface and other scope are unquoted allowances in constant real USD, not scope-complete estimates.

The design preset requires 294 kg/s, 12-inch internal bore and long-lived contact in an assumed 1 km³ reservoir; it does not establish these in a real field. The 240 °C ORC extrapolations and importing/finite-inventory failures receive no price in this tab.

NLR 2025 ATB: whole-plant costs and resource assumptions · DOE GETEM: coupled plant effectiveness and cost · GEOPHIRES-X: conversion-model boundaries. Whole-project benchmarks are not block-only prices. Source highlights and extracted primary text are retained in the QA research records.

Reproduction and evidence hashes

Rebuild from the retained QA records with tools/build-confidence-demo.py. Model runs: tools/confidence-campaign.py. Field replay: tools/forge-profile.py. The supplied page works offline without accounts, a backend or live model inference.