A geothermal invention labOpen models, records and drawings

About

About Zemanium.

Zemanium is a geothermal invention lab. We design the instruments, well hardware and models that hot wells need, test them in simulation against rules we fix beforehand, and publish what comes out.

01 / Facts

The basics.

NameZemanium (zeh-MAY-nee-um)
Founded2026
FounderToni Zemani
FieldEnhanced and superhot geothermal: well integrity, flow control, sensing, power conversion and cost modelling
StageResearch and design. Simulation campaigns, models and drawings are published; physical test campaigns come next
Contacttoni@zemanium.com
Websitehttps://zemanium.com/

02 / Mission

Make Earth's heat the world's power.

Our mission is to make geothermal the world's dominant energy source. Heat under our feet is available day and night in every country, and the obstacle is cost. We work on the equipment that decides that cost: wells that survive, flow that reaches the hot rock, instruments that keep working, and plants that convert more of the heat.

Our development target is firm geothermal power at $30 to $45 per megawatt-hour. The cost guide shows what a plant has to cost to get there.

03 / Method

How we work.

  1. Every invention goes through a simulated test campaign before any metal is cut. We write down the mechanism, the equations, the pass and fail rules and the conditions that would prove us wrong, and then we run it.
  2. The rules that judge a simulation are the rules that will judge the bench test.
  3. Every number carries a label: measured, vendor-stated, SIMULATED, assumption. A simulated result is never called a qualification.
  4. When a design fails its test we publish the failure and say what it changes.

04 / Record

The record so far.

DateWhatWhere
5 October 2026Power-cost model: 1,080 scenarios and a 2,000-draw financial stress testLive model
5 October 2026Release demonstrator drawings and a commanded-release model that passes its full test in 6 of 48 simulated campaignsDossier
8 October 2026Sensor readout software: maximum temperature error cut from 131.178 K to 1.240 K on the same simulated signalsResearch
19 November 2026Forecasts of the Project Red well pair registered and time-stamped. The model matches the Nevada regulator's record to 0.51 °F on nine steady monthsForecast and audit record
20 November 2026Three sourced guides and this open catalogueGuides, Open data

All model results are SIMULATED.

05 / Contact

Get in touch.

We are looking for engineers to lead physical test campaigns, operators and manufacturers with a hot-well problem, and investors who back hardware. Write to toni@zemanium.com and say what you need to decide. The open research page lists the kinds of work we take on.