# Geothermal companies in 2026: who is building what.

Most geothermal power today comes from long-established operators such as Ormat in the United States, Pertamina Geothermal Energy in Indonesia and KenGen in Kenya. A newer group is adding enhanced, closed-loop and superhot geothermal: Fervo Energy's Cape Station in Utah sent its first power on 24 September 2026, Eavor's closed-loop plant in Germany has delivered power since December 2025, and Sage Geosystems, XGS Energy, Zanskar, Quaise Energy and Mazama Energy have plants under way.

Milestones are the companies' own statements or press reports of them, dated and linked below. Capacity figures for listed producers are company statements. Independent summary; not investment advice. Zemanium holds no position in any security.

01 / Developers

## Which companies are building next-generation geothermal?

| Company | Approach | Latest milestone | Basis |
|---|---|---|---|
| Fervo Energy (Nasdaq: FRVO) | enhanced geothermal with horizontal wells and hydraulic stimulation | Cape Station, Utah, first power 24 September 2026 from a first unit of about 33 MW, in a 500 MW multi-phase project; Project Red pilot in Nevada since 2023 | company statements; EnergyTech and Canary Media, 2026 [[1]](https://zemanium.com/guides/geothermal-companies#s1) [[2]](https://zemanium.com/guides/geothermal-companies#s2) [[3]](https://zemanium.com/guides/geothermal-companies#s3) |
| Sage Geosystems | enhanced geothermal that stores water under pressure in fractures | 3 MW pilot near San Antonio, Texas, selling power since April 2026; next well at an Ormat plant in Nevada; 150 MW agreement with Meta | Canary Media, 19 August 2026 [[3]](https://zemanium.com/guides/geothermal-companies#s3) |
| XGS Energy | solid-state geothermal system built on thermally conductive materials | 150 MW agreement with Meta in New Mexico; engineering services from Baker Hughes; ARPA-E SUPERHOT award of $3.0m, November 2026 | company statements; ARPA-E [[4]](https://zemanium.com/guides/geothermal-companies#s4) [[9]](https://zemanium.com/guides/geothermal-companies#s9) |
| Zanskar | AI-guided exploration for hidden natural hydrothermal systems | $115m Series C, January 2026; 100 MW power purchase agreement with NV Energy for delivery by 2030; DOE field test selection, September 2026 | company statements; Renewable Energy Magazine [[5]](https://zemanium.com/guides/geothermal-companies#s5) [[6]](https://zemanium.com/guides/geothermal-companies#s6) [[2]](https://zemanium.com/guides/geothermal-companies#s2) |
| Eavor Technologies | closed loop: sealed multilateral wells, no fracturing or water from the rock | Geretsried, Germany, first power to the grid December 2025; 12 laterals, 16 km of wellbore per pair | company statement [[7]](https://zemanium.com/guides/geothermal-companies#s7) |
| Quaise Energy | millimetre-wave drilling into superhot rock | Project Obsidian, Oregon, 50 MW, power targeted by 2030; up to $25m from DOE, September 2026; $180m Series B, August 2026 | company statements; EnergyTech [[2]](https://zemanium.com/guides/geothermal-companies#s2) [[8]](https://zemanium.com/guides/geothermal-companies#s8) |
| Mazama Energy | superhot enhanced geothermal, drill bits cooled with carbon dioxide | well at 331 °C at Newberry, Oregon, in October 2025 and a later well above 700 °F; $135m raised, September 2026 | TechCrunch, 16 November 2026 [[10]](https://zemanium.com/guides/geothermal-companies#s10) |

The approaches differ in how they get heat out of the rock. Our guides explain [enhanced geothermal systems](https://zemanium.com/guides/enhanced-geothermal-systems) and [superhot rock geothermal](https://zemanium.com/guides/superhot-rock-geothermal), and the [wells guide](https://zemanium.com/guides/geothermal-wells) compares their drilling records.

02 / Listed

## Which geothermal companies are publicly traded?

| Company | Ticker | Geothermal position |
|---|---|---|
| Ormat Technologies | NYSE: ORA | 1,853 MW generating portfolio, of which 1,358 MW geothermal and solar generation (4 November 2026) |
| Fervo Energy | Nasdaq: FRVO | listed May 2026; Cape Station first power 24 September 2026 |
| Pertamina Geothermal Energy | IDX: PGEO | 1,932 MW installed in Indonesia, including partner-operated plants (Q2 2025) |
| Barito Renewables (Star Energy Geothermal) | IDX: BREN | 935.55 MW at Salak, Darajat and Wayang Windu, Indonesia |
| KenGen | NSE: KEGN | 754 MW of geothermal, mostly at Olkaria, Kenya (year to June 2025) |
| Mercury NZ | NZX: MCY | five geothermal stations, about 2,600 GWh in a mean year |
| Contact Energy | NZX: CEN | geothermal stations near Taupō, including Te Huka 3 (51.4 MW, 2024) |
| Polaris Renewable Energy | TSX: PIF | San Jacinto geothermal plant, 82 MW, Nicaragua |

Company statements; sources and plant output records are in our [geothermal stocks guide](https://zemanium.com/guides/geothermal-stocks).

03 / Utilities and suppliers

## Utilities, operators and oilfield suppliers.

- Large utilities such as Enel and Berkshire Hathaway Energy own geothermal plants as a small part of wider fleets. In Nevada's regulator record Enel is the operator of record at Salt Wells and Stillwater.
- Geysers Power Company, a subsidiary of Calpine, runs The Geysers in California, which NLR calls the most prolific geothermal field in the United States.
- Oilfield service companies sell into geothermal wells: Baker Hughes is providing engineering for XGS Energy's New Mexico project, and SLB interpreted Utah FORGE's production logs for the Department of Energy.

04 / Buyers

## Who is buying next-generation geothermal power?

Data center owners and utilities. Meta has agreements for 150 MW each with Sage Geosystems and XGS Energy. Fervo built its Project Red pilot in partnership with Google, according to Canary Media. NV Energy signed a 20-year agreement with Zanskar for 100 MW by 2030. Public geothermal power contracts signed between November 2019 and June 2025 priced at $67.50 to $99 per megawatt-hour, according to the National Laboratory of the Rockies.

05 / Zemanium

## Where Zemanium fits.

Zemanium is a geothermal invention lab working on the well itself: casing and cement that survive the heating and cooling cycles of superhot wells, and Pandora, a casing joint for wells at 450 to 500 °C. We also publish open records for the whole field: a monthly [Project Red tracker](https://zemanium.com/fervo-project-red) scored against the Nevada regulator, Nevada plant and field data, and an [LCOE calculator](https://zemanium.com/lcoe-calculator). Developers, operators and investors who want an independent review of a well or reservoir forecast can write to [toni@zemanium.com](mailto:toni@zemanium.com).

06 / Questions

## Common questions.

### What are the biggest geothermal companies?

By installed capacity, Pertamina Geothermal Energy reports 1,932 MW in Indonesia including partner-operated plants, and Ormat Technologies a 1,853 MW portfolio that includes solar and storage. KenGen runs 754 MW of geothermal in Kenya.

### What companies are doing enhanced geothermal?

Fervo Energy, which reached first power at Cape Station in Utah on 24 September 2026, Sage Geosystems, with a 3 MW pilot in Texas, and Mazama Energy, drilling superhot wells in Oregon. The Department of Energy selected Fervo, Zanskar, AlterG Resources, Quaise Energy and the University of Utah for field-scale enhanced geothermal tests in September 2026.

### Is Fervo Energy a public company?

Yes. Fervo Energy trades on Nasdaq under the ticker FRVO after pricing its initial public offering at $27 a share on 12 May 2026.

### What is closed-loop geothermal?

A system that circulates fluid through sealed wells in hot rock and takes heat by conduction, with no fracturing and no water drawn from the rock. Eavor's plant at Geretsried, Germany, connects 12 lateral wells into six pairs and has sent power to the grid since December 2025, by the company's account. Our [closed-loop geothermal guide](https://zemanium.com/guides/closed-loop-geothermal) has its results and costs.

### Which geothermal startups have raised the most money?

Among the developers on this page, Quaise Energy closed a $180m Series B in August 2026, Mazama Energy raised $135m in September 2026, and Zanskar raised a $115m Series C in January 2026, bringing its equity to $180m. Fervo Energy raised public equity in its May 2026 listing.

### Which geothermal companies are in the USA?

Fervo Energy in Utah and Nevada, Sage Geosystems in Texas, XGS Energy in New Mexico, Zanskar with a power agreement with NV Energy, and Quaise Energy and Mazama Energy in Oregon, among the developers. Ormat Technologies and Calpine, operator of The Geysers in California, run the largest existing US fleets.

07 / Sources

## Sources.

1. Fervo Energy, [first power at Cape Station](https://ir.fervoenergy.com/news-releases/news-release-details/fervo-energy-achieves-first-power-cape-station-landmark-moment), 24 September 2026, and [pricing of its initial public offering](https://fervoenergy.com/fervo-energy-announces-pricing-of-its-upsized-initial-public-offering), 12 May 2026. Company statements.
2. EnergyTech, [DOE selects Fervo, Zanskar and Quaise as part of $99M funding](https://www.energytech.com/renewables/news/55407907/doe-selects-fervo-zanskar-and-quaise-as-part-of-99m-funding-to-advance-next-gen-geothermal), 25 September 2026.
3. Canary Media, [Sage Geosystems brings its first next-gen geothermal plant online](https://www.canarymedia.com/articles/geothermal/sage-geosystems-next-gen-geothermal-online), 19 August 2026.
4. XGS Energy, [XGS Energy and Meta geothermal partnership](https://www.xgsenergy.com/governor-announces-xgs-energy-meta-geothermal-partnership-nation-leading-150-mw-geothermal-project-on-its-way-to-new-mexico/), and [collaboration with Baker Hughes](https://www.xgsenergy.com/xgs-energy-and-baker-hughes-announce-strategic-collaboration-to-advance-geothermal-development-in-new-mexico/). Company statements.
5. Zanskar, [$115M Series C](https://www.globenewswire.com/news-release/2026/01/21/3222733/0/en/zanskar-raises-115m-series-c-following-record-setting-year-of-geothermal-discoveries.html), 21 January 2026. Company statement.
6. Renewable Energy Magazine, [Zanskar inks 100 MW PPA with NV Energy](https://www.renewableenergymagazine.com/geothermal/zanskar-inks-100-mw-ppa-to-provide-20260520), 20 May 2026.
7. Eavor Technologies, [first electricity production at Geretsried](https://eavor.com/press-releases/eavor-technologies-achieves-first-electricity-production-at-geretsried-site/), 4 December 2025. Company statement.
8. Quaise Energy, [Looking back on 2025](https://www.quaise.com/news/looking-back-on-2025) and Project Obsidian release, 22 September 2026. Company statements.
9. ARPA-E, [SUPERHOT project descriptions](https://arpa-e.energy.gov/sites/default/files/2026-11/SUPERHOT_Project_Descriptions_v2.pdf), November 2026.
10. TechCrunch, [Mazama Energy has a solution for geothermal's biggest drilling problem](https://techcrunch.com/2026/11/16/mazama-energy-has-a-solution-for-geothermals-biggest-drilling-problem), 16 November 2026.
11. Akindipe and Witter, [2025 Geothermal Drilling Cost Curves Update](https://docs.nlr.gov/docs/fy25osti/92793.pdf), NREL/CP-5700-92793, July 2025 (Geysers Power Company).
12. National Laboratory of the Rockies, [Annual Technology Baseline 2025: geothermal](https://atb.nlr.gov/electricity/2025/2023/geothermal), read 27 November 2026 (power purchase agreements).
13. Listed producers: company reports listed in our [geothermal stocks guide](https://zemanium.com/guides/geothermal-stocks), read 24 November 2026; Nevada Division of Minerals, [Geothermal Production and Well Data](https://data-ndom.opendata.arcgis.com/pages/oilgasandgeothermalproduction), workbook of 29 September 2026.

Text and tables on this page are licensed [CC BY 4.0](https://creativecommons.org/licenses/by/4.0/). Cite as: Toni Zemani, "Geothermal companies in 2026: who is building what", Zemanium, 27 November 2026. [All open models, records and drawings ](https://zemanium.com/open/)

---
Source: https://zemanium.com/guides/geothermal-companies
Publisher: Zemanium (https://zemanium.com/). Contact: toni@zemanium.com
Licence: text and figures CC BY 4.0 (https://creativecommons.org/licenses/by/4.0/); code MIT.