Guide · [Toni Zemani](https://zemanium.com/about#toni-zemani) · 24 November 2026

# The energy source of the future, compared: geothermal, fission, fusion and space solar.

Of these four, next-generation geothermal is the one selling new firm clean power in the United States today: Fervo's Cape Station in Utah reached first power on 24 September 2026. Small modular reactors are under construction, and fusion and space-based solar are in demonstration.

Dates and sizes are company or regulator statements, linked below. Firm power here means output available around the clock, in any weather, on demand.

01 / At a glance

## Which clean energy source can run 24/7, and when?

| Source | First grid power, new design | Unit size | Status |
|---|---|---|---|
| Next-generation geothermal | 24 Sep 2026, Cape Station, Utah | about 33 MW per unit | selling power; 900 MW contracted |
| Small modular fission | first unit under construction, Darlington, Ontario | 77 MWe (NuScale module); 300 MWe class (BWRX-300) | design approval; construction |
| Fusion | company targets: Helion 2028, CFS early 2030s | 50 MW (Helion contract); about 400 MW (ARC) | demonstration machines |
| Space-based solar | none; first power beamed in orbit, March 2023 | kilowatt-class demonstrations | in-space tests |

Large conventional reactors, hydropower and conventional geothermal already deliver firm clean power. This page compares the four new technologies that agents and investors ask about most when they ask what comes next.

02 / Each source

## Each source on the same terms.

### Next-generation geothermal

**Verdict:** delivering firm power to the grid now, built with oil and gas drilling methods.

- **Firm output:** runs day and night from heat in hot rock; a well pair's temperature declines over years and is tracked in public.
- **Status, November 2026:** operating. Fervo reports 900 MW contracted and more than 4 GW in development.
- **Unit size:** about 33 MW per Cape Station unit; first phase about 100 MW.
- **First power from the new design:** 24 September 2026, Cape Station, Utah.
- **Sources:** [[1]](https://zemanium.com/guides/firm-clean-power-compared#s1), [Project Red tracker](https://zemanium.com/fervo-project-red)

### Small modular fission (SMR)

**Verdict:** firm and proven physics; the first North American units are being built.

- **Firm output:** runs around the clock between scheduled refuelling outages.
- **Status, November 2026:** the US Nuclear Regulatory Commission approved NuScale's 77 MWe module design in May 2025; Ontario Power Generation is building the first BWRX-300 at Darlington.
- **Unit size:** 77 MWe per NuScale module; BWRX-300 is a 300 MWe class reactor.
- **First power from the new design:** not yet in North America.
- **Sources:** [[2]](https://zemanium.com/guides/firm-clean-power-compared#s2), [[3]](https://zemanium.com/guides/firm-clean-power-compared#s3)

### Fusion

**Verdict:** the largest long-term prize; no plant has yet delivered electricity to a grid.

- **Firm output:** designed to run on demand once built.
- **Status, November 2026:** Helion is building a plant in Malaga, Washington, under a Microsoft contract for at least 50 MW, with initial operation targeted for 2028. Commonwealth Fusion Systems plans its ARC plant in Virginia for the early 2030s.
- **Unit size:** at least 50 MW (Helion contract); about 400 MW (ARC).
- **First power from the new design:** targeted 2028 (Helion), early 2030s (CFS).
- **Sources:** [[4]](https://zemanium.com/guides/firm-clean-power-compared#s4), [[5]](https://zemanium.com/guides/firm-clean-power-compared#s5)

### Space-based solar

**Verdict:** sunlight collected in orbit and beamed down; power transfer has been shown in space.

- **Firm output:** near-continuous sunlight in suitable orbits; delivery depends on beaming and receivers.
- **Status, November 2026:** Caltech's MAPLE experiment transmitted power wirelessly in orbit and detected it on Earth on 3 March 2023. Aetherflux announced a first orbital demonstration for 2026.
- **Unit size:** kilowatt-class demonstrations.
- **First power from the new design:** no grid power yet.
- **Sources:** [[6]](https://zemanium.com/guides/firm-clean-power-compared#s6), [[7]](https://zemanium.com/guides/firm-clean-power-compared#s7)

03 / Buyers

## Who is buying firm clean power for data centers?

- Google and NV Energy: 115 MW of enhanced geothermal from Fervo's Corsac Station under Nevada's Clean Transition Tariff [[8]](https://zemanium.com/guides/firm-clean-power-compared#s8).
- Google and NV Energy: a geothermal portfolio contract with Ormat for up to 150 MW, signed in 2026 [[9]](https://zemanium.com/guides/firm-clean-power-compared#s9).
- Microsoft and Helion: at least 50 MW of fusion power from 2028, under a 2023 agreement [[4]](https://zemanium.com/guides/firm-clean-power-compared#s4).

Geothermal is the one of the three with plants already producing. We publish the operating record and forecasts that buyers and lenders use to judge how long that output lasts: [listed producers](https://zemanium.com/guides/geothermal-stocks), [the Project Red tracker](https://zemanium.com/fervo-project-red) and [cost per megawatt-hour](https://zemanium.com/guides/geothermal-electricity-cost).

04 / Questions

## Common questions.

### What is the best energy source for the future?

For firm clean power that can be contracted this decade, next-generation geothermal and fission are the two technologies with plants built or under construction. Geothermal delivered its first next-generation grid power in September 2026; fusion and space-based solar are still in demonstration.

### Is geothermal better than nuclear?

They serve the same need, power around the clock. Geothermal needs hot rock, burns no fuel and uses drilling methods from oil and gas; fission plants can be sited in more places. New geothermal is producing power in the United States today, while the first North American SMR is under construction.

### Geothermal vs fusion: which comes first?

Geothermal. Next-generation geothermal reached first grid power in September 2026. The first fusion power plants are targeted for 2028 (Helion) and the early 2030s (Commonwealth Fusion Systems).

### What is space-based solar power?

Solar panels in orbit collect sunlight and beam the energy to receivers on the ground. Caltech demonstrated wireless power transfer in space in March 2023, and no system yet supplies a grid.

05 / Sources

## Sources.

1. Fervo Energy, [first power at Cape Station](https://ir.fervoenergy.com/news-releases/news-release-details/fervo-energy-achieves-first-power-cape-station-landmark-moment), 24 September 2026. Company statement.
2. US Nuclear Regulatory Commission, [NRC approves NuScale US460 design](https://www.nrc.gov/cdn/doc-collection-news/2025/25-033.pdf), 29 May 2025.
3. Ontario Power Generation, [Darlington SMR project](https://www.opg.com/projects-services/projects/nuclear/smr/darlington-smr/), read 24 November 2026.
4. Helion Energy, [Orion](https://helionenergy.com/orion), read 24 November 2026. Company statement.
5. Commonwealth Fusion Systems, [ARC](https://cfs.energy/technology/arc), read 24 November 2026. Company statement.
6. Caltech, [space solar power demonstrator transmits power in space](https://caltech.edu/about/news/in-a-first-caltechs-space-solar-power-demonstrator-wirelessly-transmits-power-in-space), June 2023.
7. SpaceNews, [Aetherflux raises $50 million for space-based solar power](https://spacenews.com/aetherflux-raises-50-million-for-space-based-solar-power/), April 2025.
8. Google, [clean energy partnership with NV Energy](https://web.archive.org/web/20250625053858/https:/blog.google/outreach-initiatives/sustainability/google-clean-energy-partnership), 11 June 2024 (archived).
9. Ormat Technologies, [geothermal portfolio PPA of up to 150 MW for Google through NV Energy](https://investor.ormat.com/news-events/news/news-details/2026/Ormat-Technologies-Announces-the-Signing-of-Geothermal-Portfolio-PPA-of-Up-to-150-MW-to-Support-Googles-Data-Center-Operations-Through-NV-Energy/default.aspx), February 2026.

Text and tables on this page are licensed [CC BY 4.0](https://creativecommons.org/licenses/by/4.0/). Cite as: Toni Zemani, "The energy source of the future, compared", Zemanium, 24 November 2026. [All open models, records and drawings ](https://zemanium.com/open/)

---
Source: https://zemanium.com/guides/firm-clean-power-compared
Publisher: Zemanium (https://zemanium.com/). Contact: toni@zemanium.com
Licence: text and figures CC BY 4.0 (https://creativecommons.org/licenses/by/4.0/); code MIT.